SAR Scenario Peterborough Shunter V2

From TrainzOnline
Jump to: navigation, search
ArrowLeftBtn.png
 11 
  12   Peterborough Shunter 

A scenario in the SAR Peterborough Base Session v2.0

This scenario has been updated in V2.0. For the original V1.0 scenario, click here
ArrowRightBtn.png
 13 
Shunting operations in Peterborough yard, sidings and depot. Bottom

 When, Where and With What 

Peterborough Shunter
 Era:  1920s to 1980s
 Duration:  1 hour
 Loco:  The Loco Roster Label.png has locos available at the  Peterborough Loco Depot 
 Consist:  To be shunted by the selected loco to/from various locations

 Similar/Related Scenarios 

 13   Gladstone Shunter  14   Terowie Shunter  15   Quorn Shunter
 19   Servicing the Broad Gauge Express  


Location Index

Each location in the layout has a detailed set of track diagrams that provide a variety of useful information

The  Getting Started  guide below gives a summary of what is available.

To display this information click any Location Index graphic, or go to the bottom of the page for all the session links (all links will open in this window).
Getting Started:
  1. If you have already closed the opening message window then the first step is to pause the session by pressing the  P  key.
  2. If you decide to set the session clock to a different starting time then follow the instructions shown in the Orders section below
  3. Next locate your loco. Either:-
    • Open the Finder Tool (press  Ctrl   F ) and type, in the Name field, the name of your selected loco. For example SAR T 233 (or just T 233 should be enough). Click the tick icon, OR
    • Open the Driver List (bottom left of the screen) and then scroll through the list to find either:-
    • the loco name (SAR T 233) OR
    • the driver icon (named Driver 233) - this is a non-animated icon
    then click the drivers Eye icon Driver Eye.png to take control of the loco
  4. Take a few moments to get your bearings. Click Peterborough Data (this link will open in this window) to show the location details and track plans for Peterborough. In each location details page:-
    • the Tab HM White.png tab gives an overall summary of each location with a "potted" history (where available).
    • the Tab TM Grey.png tab reveals the invisible TM Track Marks for Drive To commands.
    • the Tab IN Grey.png tab lists all active industries and their commodities.
    • the Tab SW Grey.png tab describes the names, locations and settings of all junction switches as well as some switch sets you may want to use.
  5. Each location details page has direct links to the adjacent locations so you can explore along the route.
  6. When you are ready to start, reload the Peterborough Base Session page (click the Scenarios button on your current location page) and select this Scenario again or just use the Back button on your browser - whichever is quicker.
  7. Switch back to Trainz Driver Mode
  8. Close the opening message window and, if Pause is shown on the screen, press the  P  key to start the session.


Tutorial:
Tutorial A tutorial on using these scenarios is provided in the link on the left. The link will open in this window


Yard Map:
Yard map
 


Orders:
  1. Move the loco out of the  Loco  Depot and navigate through to the other side of Peterborough Yard onto the  Stockyard  road.
  2. Reverse onto  Goods Siding 4  and attach to the rake of empty MTW flat wagons stored there.
  3. Move the empty wagons to the  Goods Crane  and load.
  4. Shunt the loaded wagons to  Goods Siding 3  and stable.
  5. Move the loco to  Goods Siding 5  and attach to the rake of empty Livestock wagons stored there.
  6. Shunt the empty wagons to the  Stockyard Siding  at the far end of the  Stockyard  road for pickup by another service.
  7. Move the loco back into the main depot to the  Loco Depot Sidings  next to the tall water tower. There are empty coal (CCC) and fuel (Tank) wagons stored on two of the siding roads.
  8. Shunt the two wagon sets into a single consist and stable on one of the empty  Loco Depot Sidings  roads for pickup by another service.
  9. Move the loco to the back of the workshop area at the end of the  Depot  Repair Storage Road .
  10. Attach to loco SAR T 229 (not in steam) and move it dead attached into the repair shop on  Depot  Repair Shop Road  2. Detach the loco.
  11. Return the loco to the  Loco Depot .
Logo
The Base Session has the clock set to start at Clock 0800.png
This can be changed to any required time. For the details see WikiLink.PNGSAR Scenario Session Time Change
Strip Map
Route Key
Driving Notes:
  • You have permission to pass signals at stop provided you are satisfied that the road ahead is clear.
  • When driving manually in yards, you are responsible for correctly setting any catch points.
Links: All links will open in this window
ArrowLeftBtn.png
 11 
Scenarios
Scenario Index
Location Index
Location Index
Tutorial
Drive Tutorial
Rolling Stock
Rolling Stock List
Loco Roster
Loco Roster
Industries
Active Industries
Top ArrowRightBtn.png
 13 

This page was created by Trainz user pware in February 2021 and was last updated as shown below.


Personal tools