SAR Scenario Gladstone Shunter
From TrainzOnline
| Gladstone Shunter | |
| Shunting operations in Gladstone Yard and nearby sidings. | |
| Duration: | 40 minutes | ||
| Loco: | SAR T 210 at Gladstone Depot Other Unrostered Locos: none |
||
|
|||
Tasks:
|
|||
Driving Notes:
|
|||
| Links: All links will open in this window | ||||
![]() Session Scenarios List |
![]() Location List |
Rolling Stock |
Active Industries |
|
This page was created by Trainz user pware in February 2021 and was last updated as shown below.


