SAR Scenario Gladstone Shunter
From TrainzOnline
Gladstone Shunter | |
Shunting operations in Gladstone Yard and nearby sidings. | ![]() |
Duration: | 40 minutes | ||
Loco: | SAR T 210 at Gladstone Depot Other Unrostered Locos: none |
||
|
|||
Tasks:
|
|||
Driving Notes:
|
Links: All links will open in this window | ||||
![]() Session Scenarios List |
![]() Location List |
![]() Rolling Stock |
![]() Active Industries |
![]() |
This page was created by Trainz user pware in February 2021 and was last updated as shown below.