SAR Carrieton Industry V2
From TrainzOnline
(Difference between revisions)
m |
m |
||
Line 123: | Line 123: | ||
* '''Track Mark''' [[image:Trackmark_Right.png|link=|alt=TM|10px]] <span style="font-weight: 700; color: blue;">Carrieton Water Columns Station Dn Approach</span> located on the left of the water columns</td> | * '''Track Mark''' [[image:Trackmark_Right.png|link=|alt=TM|10px]] <span style="font-weight: 700; color: blue;">Carrieton Water Columns Station Dn Approach</span> located on the left of the water columns</td> | ||
</tr> | </tr> | ||
− | |||
<tr valign="top"> | <tr valign="top"> | ||
<td width=70> </td> | <td width=70> </td> | ||
− | <td> | + | <td><span style="font-weight: 700;">Each water column pair has a Trackmark placed on the long approach side as an AI destination for positioning the loco and then manually driving to move the tender alongside the column for loading. Water columns in pairs are spaced to allow both tenders in a consist double-headed by SAR T class locos to load water at the same time</span></td> |
</tr> | </tr> | ||
Revision as of 12:28, 4 October 2025
|
![]() |