SAR Jamestown
From TrainzOnline
		(Difference between revisions)
		
		
m  | 
			m  | 
			||
| Line 86: | Line 86: | ||
Multiple loops and sidings including goods, grain and storage. Loco servicing facility.<br>  | Multiple loops and sidings including goods, grain and storage. Loco servicing facility.<br>  | ||
| − | After the conversion of the line to standard gauge (1969-70  | + | After the conversion of the line to standard gauge (4ft8½in - 1435mm) in 1969-70 '''Jamestown''' became a passing loop with sidings and a new grain terminal. The goods and servicing facilities have been removed.<br>  | 
The station building is being reused as a local museum. Rail passenger services no longer stop at '''Jamestown'''  and passengers now rely on a bus service.  | The station building is being reused as a local museum. Rail passenger services no longer stop at '''Jamestown'''  and passengers now rely on a bus service.  | ||

