SAR Gumbowie
From TrainzOnline
		(Difference between revisions)
		
		
m  | 
			m  | 
			||
| Line 79: | Line 79: | ||
Passing and siding loops. A signal box and a small station building that were originally present on the main line had been removed by the start of the 1960s. After '''Belalie North''' was bypassed by the gauge conversion (1969-70) '''Gumbowie''' became the highest point in the '''SAR''' system.<br>  | Passing and siding loops. A signal box and a small station building that were originally present on the main line had been removed by the start of the 1960s. After '''Belalie North''' was bypassed by the gauge conversion (1969-70) '''Gumbowie''' became the highest point in the '''SAR''' system.<br>  | ||
| − | The main line and passing loop were converted to dual gauge with the addition of a broad gauge (5ft 3in, 1600mm) track to the existing narrow gauge (3ft 6in, 1067mm) in 1970 but the siding remained narrow gauge only. The '''Peterborough-Terowie Line''' was closed in 1988.  | + | The main line and passing loop were converted to dual gauge with the addition of a broad gauge (5ft 3in, 1600mm) track to the existing narrow gauge (3ft 6in, 1067mm) in 1970 but the siding remained narrow gauge only. The '''Peterborough-Terowie Line''' was closed in 1988.<br>  | 
| + | |||
| + | Today nothing remains at '''Gumbowie''' to indicate that it was once a railway location.  | ||
</td>  | </td>  | ||
</tr>  | </tr>  | ||

