SAR Scenario Terowie Shunter
From TrainzOnline
(Difference between revisions)
m |
m |
||
Line 83: | Line 83: | ||
# Move the loco out of the <span style="font-weight: 700;"><span style="color: white; background-color: black;"> Loco </span> Depot</span> and run tender first past the <span style="color: black; background-color: white; font-weight: 700;"> Station </span> to the <span style="font-weight: 700;"><span style="color: black; background-color: yellow"> Goods Transfer </span> Sidings</span>. | # Move the loco out of the <span style="font-weight: 700;"><span style="color: white; background-color: black;"> Loco </span> Depot</span> and run tender first past the <span style="color: black; background-color: white; font-weight: 700;"> Station </span> to the <span style="font-weight: 700;"><span style="color: black; background-color: yellow"> Goods Transfer </span> Sidings</span>. | ||
# Couple the loco to the rake of '''MTW''' flat wagons stored on the northern ('''Peterborough''') end of <span style="color: black; background-color: yellow; font-weight: 700;"> Goods Siding 2 </span>. | # Couple the loco to the rake of '''MTW''' flat wagons stored on the northern ('''Peterborough''') end of <span style="color: black; background-color: yellow; font-weight: 700;"> Goods Siding 2 </span>. | ||
− | # Take the '''MTW''' flat wagons to the | + | # Take the '''MTW''' flat wagons to the <span style="color: black; background-color: yellow; font-weight: 700;"> Goods Gantry </span> to be loaded. |
− | # After loading take the wagons back to the | + | # After loading take the wagons back to the <span style="font-weight: 700;"><span style="color: black; background-color: yellow; font-weight: 700;"> Goods Transfer </span> Sidings</span> and store them on <span style="color: black; background-color: yellow; font-weight: 700;"> Goods Siding 1 </span>. |
# Couple the loco to the rake of '''QLX''' wagons on <span style="color: black; background-color: yellow; font-weight: 700;"> Goods Siding 2 </span>. | # Couple the loco to the rake of '''QLX''' wagons on <span style="color: black; background-color: yellow; font-weight: 700;"> Goods Siding 2 </span>. | ||
− | # Take the '''QLX''' wagons to the | + | # Take the '''QLX''' wagons to the <span style="font-weight: 700;"><span style="color: black; background-color: yellow; font-weight: 700;"> Goods Transfer </span> Shed</span> and load. |
# After loading move the wagons onto <span style="color: black; background-color: yellow; font-weight: 700;"> Goods Siding 2 </span>. | # After loading move the wagons onto <span style="color: black; background-color: yellow; font-weight: 700;"> Goods Siding 2 </span>. | ||
# The two rakes of loaded wagons on <span style="color: black; background-color: yellow; font-weight: 700;"> Goods Siding 1 </span> and <span style="color: black; background-color: yellow; font-weight: 700;"> Goods Siding 2 </span> must be split and recombined into two consists according to their destinations. The destinations, '''Peterborough''' and '''Gladstone''', are shown in the name of each wagon. All the '''Gladstone''' wagons are to be placed into one consist and the '''Peterborough''' wagons into the other consist. | # The two rakes of loaded wagons on <span style="color: black; background-color: yellow; font-weight: 700;"> Goods Siding 1 </span> and <span style="color: black; background-color: yellow; font-weight: 700;"> Goods Siding 2 </span> must be split and recombined into two consists according to their destinations. The destinations, '''Peterborough''' and '''Gladstone''', are shown in the name of each wagon. All the '''Gladstone''' wagons are to be placed into one consist and the '''Peterborough''' wagons into the other consist. |
Revision as of 15:44, 26 February 2021
Terowie Shunter | |
Shunting operations in Terowie Yard. |
Duration: | xx minutes | ||
Loco: | SAR T 198 at Terowie Depot Other Unrostered Locos:
|
||
|
Yard Map: | ||
Tasks:
|
||
|
Links: All links will open in this window | ||||
Session Scenarios List |
Location List |
Rolling Stock |
Active Industries |
This page was created by Trainz user pware in February 2021 and was last updated as shown below.