Talk:SAR Terka
From TrainzOnline
(Difference between revisions)
Line 1: | Line 1: | ||
− | Track and interlocking tower paths diagram of Terka on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) | + | Track and interlocking tower paths diagram of Terka on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) as it existed in the early 1960s. When the Broken Hill to Port Pirie line was standardised in 1969, the Wilmington Line became an isolated narrow gauge branch line until it closed in 1990. Created to support the TRS19 version layout. |
Revision as of 22:10, 13 November 2019
Track and interlocking tower paths diagram of Terka on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) as it existed in the early 1960s. When the Broken Hill to Port Pirie line was standardised in 1969, the Wilmington Line became an isolated narrow gauge branch line until it closed in 1990. Created to support the TRS19 version layout.