SAR Scenario Terowie Shunter
m |
m |
||
Line 20: | Line 20: | ||
'''Terowie's''' only role was as a change of gauge location. Passengers and freight from '''Adelaide''' arrived from the south on the '''broad gauge (5ft 3in)''' line and were transferred to wagons on the '''narrow gauge (3ft 6in)''' line to continue north to '''Peterborough''' and onto destinations on the '''Broken Hill''', '''Trans Continental''' and '''Central Australia''' lines. The reverse arrangement applied to traffic travelling south to '''Adelaide'''.<br> | '''Terowie's''' only role was as a change of gauge location. Passengers and freight from '''Adelaide''' arrived from the south on the '''broad gauge (5ft 3in)''' line and were transferred to wagons on the '''narrow gauge (3ft 6in)''' line to continue north to '''Peterborough''' and onto destinations on the '''Broken Hill''', '''Trans Continental''' and '''Central Australia''' lines. The reverse arrangement applied to traffic travelling south to '''Adelaide'''.<br> | ||
− | Passengers simply moved from one platform across to another at the station. Goods and livestock were manually moved from wagons of one gauge on one side of a transfer platform to wagons of the other gauge on the other side, or by gantry crane from one train to the other. Much later a bogie exchange system was introduced to help eliminate the manual handling of freight. By 1970 the broad gauge line was extended to '''Peterborough''' and the role of '''Terowie''' | + | Passengers simply moved from one platform across to another at the station. Goods and livestock were manually moved from wagons of one gauge on one side of a transfer platform to wagons of the other gauge on the other side, or by gantry crane from one train to the other. Much later a bogie exchange system was introduced to help eliminate the manual handling of freight. By 1970 the broad gauge line was extended to '''Peterborough''' and the role and importance of '''Terowie''' was greatly reduced. By 1988 the line from '''Adelaide''' to '''Peterborough''' was closed. |
----- | ----- |
Revision as of 11:34, 12 June 2022
14 Terowie Shunter | ||
A scenario in the SAR Peterborough Base Session |
Shunting operations in Terowie Yard. |
The Historical Bit
Terowie's only role was as a change of gauge location. Passengers and freight from Adelaide arrived from the south on the broad gauge (5ft 3in) line and were transferred to wagons on the narrow gauge (3ft 6in) line to continue north to Peterborough and onto destinations on the Broken Hill, Trans Continental and Central Australia lines. The reverse arrangement applied to traffic travelling south to Adelaide.
Passengers simply moved from one platform across to another at the station. Goods and livestock were manually moved from wagons of one gauge on one side of a transfer platform to wagons of the other gauge on the other side, or by gantry crane from one train to the other. Much later a bogie exchange system was introduced to help eliminate the manual handling of freight. By 1970 the broad gauge line was extended to Peterborough and the role and importance of Terowie was greatly reduced. By 1988 the line from Adelaide to Peterborough was closed.
|
Tutorial:
|
|
|
Links: All links will open in this window | ||||||||
Session Scenarios |
Location List |
Drive Tutorial |
Rolling Stock |
Loco Roster |
Active Industries |
This page was created by Trainz user pware in February 2021 and was last updated as shown below.