SAR Scenario Terowie Shunter
From TrainzOnline
(Difference between revisions)
m |
m |
||
Line 81: | Line 81: | ||
<tr valign="top"> | <tr valign="top"> | ||
<td><span style="font-size: 15px; font-weight: 700;">Tasks:</span> | <td><span style="font-size: 15px; font-weight: 700;">Tasks:</span> | ||
− | # Move the loco out of the <span style="font-weight: 700;"><span style="color: white; background-color: black;"> Loco </span> Depot</span> and run tender first past the <span style="color: black; background-color: white | + | # Move the loco out of the <span style="font-weight: 700;"><span style="color: white; background-color: black;"> Loco </span> Depot</span> and run tender first past the <span style="font-weight: 700; color: black; background-color: white;"> Station </span> to the <span style="font-weight: 700;"><span style="color: black; background-color: yellow"> Goods Transfer </span> Sidings</span>. |
− | # Couple the loco to the rake of '''MTW''' flat wagons stored on the northern ('''Peterborough''') end of <span style="color: black; background-color: yellow | + | # Couple the loco to the rake of '''MTW''' flat wagons stored on the northern ('''Peterborough''') end of <span style="font-weight: 700; color: black; background-color: yellow;"> Goods Siding 2 </span>. |
− | # Take the '''MTW''' flat wagons to the <span style="color: black; background-color: yellow | + | # Take the '''MTW''' flat wagons to the <span style="font-weight: 700; color: black; background-color: yellow;"> Goods Gantry </span> to be loaded. |
− | # After loading take the wagons back to the <span style="font-weight: 700;"><span style="color: black; background-color: yellow | + | # After loading take the wagons back to the <span style="font-weight: 700;"><span style="font-weight: 700; color: black; background-color: yellow;"> Goods Transfer </span> Sidings</span> and store them on <span style="font-weight: 700; color: black; background-color: yellow;"> Goods Siding 1 </span>. |
− | # Couple the loco to the rake of '''QLX''' wagons on <span style="color: black; background-color: yellow | + | # Couple the loco to the rake of '''QLX''' wagons on <span style="font-weight: 700; color: black; background-color: yellow;"> Goods Siding 2 </span>. |
− | # Take the '''QLX''' wagons to the <span style="font-weight: 700;"><span style="color: black; background-color: yellow | + | # Take the '''QLX''' wagons to the <span style="font-weight: 700;"><span style="font-weight: 700; color: black; background-color: yellow;"> Goods Transfer </span> Shed</span> and load. |
− | # After loading move the wagons onto <span style="color: black; background-color: yellow | + | # After loading move the wagons onto <span style="font-weight: 700; color: black; background-color: yellow;"> Goods Siding 2 </span>. |
− | # The two rakes of loaded wagons on <span style="color: black; background-color: yellow | + | # The two rakes of loaded wagons on <span style="font-weight: 700; color: black; background-color: yellow;"> Goods Siding 1 </span> and <span style="font-weight: 700; color: black; background-color: yellow;"> Goods Siding 2 </span> must be split and recombined into two consists according to their destinations. The destinations, '''Peterborough''' and '''Gladstone''', are shown in the name of each wagon. All the '''Gladstone''' wagons are to be placed into one consist and the '''Peterborough''' wagons into the other consist. |
# Combine the two consists into one consist with the '''Peterborough''' wagons at the front ('''Peterborough''') end the '''DB''' Guard Van at the rear of the '''Gladstone''' wagons. | # Combine the two consists into one consist with the '''Peterborough''' wagons at the front ('''Peterborough''') end the '''DB''' Guard Van at the rear of the '''Gladstone''' wagons. | ||
# Move the combined consist onto the <span style="font-weight: 700; color: white; background-color: #b8860b;"> Relief </span> road in the main '''Terowie Yard'''. | # Move the combined consist onto the <span style="font-weight: 700; color: white; background-color: #b8860b;"> Relief </span> road in the main '''Terowie Yard'''. |
Revision as of 16:32, 26 February 2021
Terowie Shunter | |
Shunting operations in Terowie Yard. |
Duration: | xx minutes | ||
Loco: | SAR T 198 at Terowie Depot Other Unrostered Locos:
|
||
|
Yard Map: | ||
Tasks:
|
||
|
Links: All links will open in this window | ||||
Session Scenarios List |
Location List |
Rolling Stock |
Active Industries |
This page was created by Trainz user pware in February 2021 and was last updated as shown below.