How to Merge Routes

From TrainzOnline
(Difference between revisions)
Jump to: navigation, search
(Trainz Wiki)
m (Common Problems (and Their Solutions))
Line 55: Line 55:
 
<tr valign="top">
 
<tr valign="top">
 
<td>
 
<td>
*Another fixable problem can occur if a layer containing track from the ''to-be-merged route'' ends up below the layer that also contains track in the ''base route''. This can be fixed by merging the lower track layer into the higher track layer either during the merging process or afterwards using the '''Layer Tools''' in Surveyor.
+
*Another fixable problem can occur if a layer containing track from the ''to-be-merged route'' ends up below the layer that also contains track in the ''base route''. This can be fixed by merging the lower track layer into the higher track layer either during the merging process or afterwards using the [[file:WikiLink.PNG]] '''[[How to Use Layers|Layer Tools]]''' in Surveyor.
 
</td>
 
</td>
 
</tr>
 
</tr>
 
</table>
 
</table>
 +
<br>
 
<table cellpadding="4" bgcolor=#fcbcbc>
 
<table cellpadding="4" bgcolor=#fcbcbc>
 
<tr valign="top">
 
<tr valign="top">

Revision as of 08:06, 14 July 2018

Contents

Merging Routes

The Surveyor Merge Routes command allows two different routes to be joined together - edge to edge.

Before You Start Merging

DotPoint.JPG Make sure that you have backup copies of all the routes that you are going to merge.


Before you start merging there are some important points you will need to consider and there may be some preparation work that will have to be performed.

PencilTips.PNG Identify...
  • the route that will be the base route. This route will form the backbone of the merged routes. It will usually be the larger route or the route that contains Session data that you want to keep in the merge.
  • the route that will be the to-be-merged route. This route will be joined to the base route.
  • the orientation (North-South or East-West) of both routes. Are they both the same or are they different?
  • the baseboards in both routes where they will be joined. The join must be along edges.
  • the height of the baseboards in both routes at the merge point. Are they the same height or different heights?
  • the layers in both routes. Are there any layers in the two routes that have the same names?
  • which layers in both routes contain the tracks and the track objects (signals, switches, speed signs, etc).

Common Problems (and Their Solutions)

DotPoint.JPG Most route mergers will have problems but most of these problems can be easily fixed.

Some problems will require you to do a bit (or a lot) of extra work before you can merge two routes into one. But for some problems, the best solution may be to select other routes to merge.

MergeHeightProblem.JPG
  • The easiest and most common problems will be fixed during the merging process itself.
  • The most common problem in the "hard to fix but do-able" category is merging two routes that have been built at different heights or altitudes. This will create a vertical cliff along the merge line, as shown on the left. The solutions to this will vary depending on the height difference. Common solutions are:-
    • add extra baseboards between the two routes to create an easy gradient between them. See the "Tips" box below. If the height difference is large then many additional baseboards will be needed. If the difference is too big then other options may have to be considered.
    • use a spiral tunnel or switchback/zigzag to build track between the two levels. This will reduce number of extra baseboards.
    • add portals to both routes so that a consist entering the portal on one route will emerge from the portal on the other route. Portals can have their own issues and this solution may not suit everyone and every layout.
  • Another fixable problem can occur if a layer containing track from the to-be-merged route ends up below the layer that also contains track in the base route. This can be fixed by merging the lower track layer into the higher track layer either during the merging process or afterwards using the WikiLink.PNG Layer Tools in Surveyor.


Stop.PNG The most common problem in the "impossible to fix" category is when both routes have different orientations (N-S and E-W) and you were hoping to join them end-to-end in the same direction to make an even longer route. Once a route has been created its orientation cannot be changed.


PencilTips.PNG A handy tip for merging two routes with different heights is to create a new route that only contains the extra "in-between" baseboards - no scenery, textures or track are needed. The baseboards on one end will have heights that match those of the base route and the baseboards on the other end will have heights that match those of the to-be-merged route. The merge is performed in two stages:-
  • the new bridging route is merged with the Base route.
  • the selected to-be-merged route is merged with the Base + bridging route.
This avoids having to add the extra baseboards to the original routes.


Selecting and Loading the Routes to Merge

  • Load the Base Route into Surveyor
Question.PNG Should you load the Route or the Session?


The answer depends on whether or not the Session contains assets (scenery, consists) and settings (rules, driver commands, industry and wagon loads, weather, time of day, etc) that you want to continue to use in the new merged Route and its Session.

Note that when you add the to-be-merged route its Route assets and data will be loaded but not any Session assets or data so this is the only opportunity you will have to load any Session assets and data. If the Session attached to the Base Route contains nothing that you need then load the Route only into Surveyor.

  • Select and load the Route to-be-merged with the Base Route.
MergeMainMenu.JPG

Steps.PNG Steps:
  • Select the Merge Route option in the Surveyor Main Menu
This will open a Route Selection window.
  • Select the route to-be-merged

MergeSelectRoute.JPG

This will be the to-be-merged route and only its Route data will be loaded
DotPoint.JPG DLC routes cannot be selected for merging

This will display a "minimap" of the proposed merger (nothing will be merged until after the final step) with some control options.

The Merge Map

MergeMiniMapComplexTerrain01.JPG

The two tabs shown on the left are the:-

  • Terrain Tab which is automatically selected when the MiniMap is first displayed. This shows the baseboards of the to-be-merged route superimposed on the baseboards of the base route. A red background colour on this tab, as shown in the figure on the left, indicates that the two routes have baseboards that are in conflict - they are overlapping. The overlapping baseboards are shown in red on the MiniMap.
  • Layers Tab. This shows the layers that have been copied from both routes. A red background colour on this tab indicates that the two routes have layers that are in conflict.


NotePad.PNG Notes:
  • You can zoom the MiniMap in and out using the mouse control wheel. There appears to be no keyboard zoom control.
  • You can move the centre of focus (the centre of the MiniMap view) by moving the mouse pointer to a new position and clicking with the right button.
  • The four arrows shown at the top, bottom and both sides of the map display can be clicked to move the to-be-merged route in the direction shown by each arrow.


Move the To-Be-Merged Route into its New Position

MergeMiniMapComplexTerrain02.JPG
Steps.PNG Steps:
  • Click on the direction arrows shown at the top, bottom and sides of the MiniMap window to move the to-be-merged route into its correct position
  • Each click will move the to-be-merged route one baseboard in the selected direction


In the example shown on the left, clicking the Left arrow 5 times moved the to-be-merged route 5 baseboards to the left to a position where there were no overlapping baseboards and all terrain conflicts were resolved.

DotPoint.JPG A route merge will not proceed until ALL the terrain and layer conflicts have been eliminated.


The Layers Map

Click the Layers Tab to show the layers loaded from the two routes.

DotPoint.JPG A route merge will not proceed until ALL the terrain and layer conflicts have been eliminated.


In the example shown below two of the layers, one from each route, are using the same name "route-layer". This causes a conflict that must be resolved before the merge can be completed.

There are three simple options for solving this problem:-

DotPoint1.JPG Rename one of the conflicting layers. Double click on the layer name to enter a new name.
MergeMiniMapLayersConflict.JPG

MergeMiniMapLayersConflictRename01.JPG

After renaming ...
MergeMiniMapLayersConflictRename02.JPG

... the conflict has now been resolved.


DotPoint2.JPG Delete one of the conflicting layers. Select the layer and click on the Delete icon.
MergeMiniMapLayersConflictDelete.JPG


Stop.PNG CAUTION: Deleting a layer will delete all its contents.


After clicking the Delete Icon ...

MergeMiniMapLayersConflictMerge02.JPG
... the conflict has now been resolved.


DotPoint3.JPG Merge one of the conflicting layers.

Steps.PNG Steps:
  1. Select the layer that is to be merged
  2. Click on the Merge icon (next to the Delete Icon)
This will open a list of layers (shown below).

MergeMiniMapLayersConflictMerge01.JPG
Stop.PNG CAUTION: When selecting a layer to merge into be aware that layers containing track objects such as signals, switches, speed signs, etc CANNOT be placed above a layer that contains the track.

Steps.PNG Steps:
  1. Select the layer it will be merged into
  2. Click the Tick button.


After merging ...

MergeMiniMapLayersConflictMerge02.JPG

... the conflict has now been resolved.


Accept or Reject

Once all the conflicts have been resolved, the final step in the merging process can take place.

MergeCancelAccept.JPG
DotPoint.JPG ACCEPT: Click the Tick button to accept the merge. This icon will not be usable unless ALL conflicts have been resolved.
DotPoint.JPG REJECT: Click the Cross button to reject the merge. The merging will be cancelled, no routes will be lost or altered.



Trainz Wiki

TrainzWiki.png

More Tutorials and Guides to Using Trainz

Personal tools