CDE Multiple Industry New
(created page) |
m (added better description) |
||
Line 1: | Line 1: | ||
− | + | CDE Multiple Industry New<br>KUID:647907:100648<br>Last Updated: 23rd Nov 2020<br>File Size: 170.53 kb | |
− | + | ||
− | + | ||
− | + | CDETrainz.com Multiple Industry New for TANE and TRS19<br>Cloned from Auran Multiple_Industry_New kuid:-25:1224 and revised to allow 6 commodities in both the Consume and Produce under the Processes tab for a total of 12 processes. Available through your Content Manager or on the DLS. | |
− | + | ||
− | + | If you are using the Built-in Multiple_Industry_New <kuid:-25:1224> by Auran you will be limited to 3 commodities (queue's) in the Consume (input) or Produce (output) under the Processes tab. If you have more, you will not be able to change the Processes tab for the 4th commodity and up as it only will show the first 3 for the input and outputs (6 processes total). | |
− | + | ||
− | + | In our updated version, there are 6 queues in the Queues tab. Only one commodity allowed in each queue. So the limit on commodities is 6. But then, with this new asset you can put any combination of commodities in both the Consume and Produce in the Processes tab. 6 on each side, 12 processes total, doubling the original version. | |
− | + | ||
− | + | ||
− | < | + | More info can be found on our website;<br> |
− | + | <b>[https://cdetrainz.com/assets_asset.aspx?aid=11 CDETrainz.com - USA]</b> | |
− | + | ||
− | + |
Revision as of 00:49, 10 December 2020
CDE Multiple Industry New
KUID:647907:100648
Last Updated: 23rd Nov 2020
File Size: 170.53 kb
CDETrainz.com Multiple Industry New for TANE and TRS19
Cloned from Auran Multiple_Industry_New kuid:-25:1224 and revised to allow 6 commodities in both the Consume and Produce under the Processes tab for a total of 12 processes. Available through your Content Manager or on the DLS.
If you are using the Built-in Multiple_Industry_New <kuid:-25:1224> by Auran you will be limited to 3 commodities (queue's) in the Consume (input) or Produce (output) under the Processes tab. If you have more, you will not be able to change the Processes tab for the 4th commodity and up as it only will show the first 3 for the input and outputs (6 processes total).
In our updated version, there are 6 queues in the Queues tab. Only one commodity allowed in each queue. So the limit on commodities is 6. But then, with this new asset you can put any combination of commodities in both the Consume and Produce in the Processes tab. 6 on each side, 12 processes total, doubling the original version.
More info can be found on our website;
CDETrainz.com - USA