Talk:SAR Paratoo (Basic)

From TrainzOnline
(Difference between revisions)
Jump to: navigation, search
m
m
 
(One intermediate revision by one user not shown)
Line 1: Line 1:
Track and switch diagram of Paratoo on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) early 1960s prior to the arrival of the standard gauge Sydney to Perth Trans-Continental line. The standard gauge line replaced the narrow gauge line from Port Pirie to Broken Hill. Created to support the TRS19 version layout.
+
Track and switch diagram of Paratoo on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. The Broken Hill to Port Pirie line was converted to standard gauge in 1969. Created to support the TRS19 version layout.

Latest revision as of 13:04, 15 November 2019

Track and switch diagram of Paratoo on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. The Broken Hill to Port Pirie line was converted to standard gauge in 1969. Created to support the TRS19 version layout.

Personal tools