Talk:SAR Orroroo (Basic)

From TrainzOnline
(Difference between revisions)
Jump to: navigation, search
(Created page with "Track diagram of Orroroo on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) early 1960s prior to the arrival of the standard gaug...")
 
m
 
(2 intermediate revisions by one user not shown)
Line 1: Line 1:
Track diagram of Orroroo on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) early 1960s prior to the arrival of the standard gauge Sydney to Perth Trans-Continental line when the Quorn Line became an isolated narrow gauge branch line. The turning WYE included in this diagram was actually removed in the 1930s. Created to support the TRS19 version layout.
+
Track and switch diagram of Orroroo on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. When the Broken Hill to Port Pirie line was converted to standard gauge in 1969, the Quorn Line became an isolated narrow gauge branch line until it was closed in 1988. The turning WYE included in this diagram was actually removed in the 1930s. Created to support the TRS19 version layout.

Latest revision as of 12:08, 14 November 2019

Track and switch diagram of Orroroo on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. When the Broken Hill to Port Pirie line was converted to standard gauge in 1969, the Quorn Line became an isolated narrow gauge branch line until it was closed in 1988. The turning WYE included in this diagram was actually removed in the 1930s. Created to support the TRS19 version layout.

Personal tools