Talk:SAR Orroroo (Basic)
From TrainzOnline
(Difference between revisions)
m |
m |
||
Line 1: | Line 1: | ||
− | Track and switch diagram of Orroroo on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) early 1960s | + | Track and switch diagram of Orroroo on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. When the Broken Hill to Port Pirie line was later converted to standard gauge, the Quorn Line became an isolated narrow gauge branch line until it was closed in 1988. The turning WYE included in this diagram was actually removed in the 1930s. Created to support the TRS19 version layout. |
Revision as of 12:45, 13 November 2019
Track and switch diagram of Orroroo on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. When the Broken Hill to Port Pirie line was later converted to standard gauge, the Quorn Line became an isolated narrow gauge branch line until it was closed in 1988. The turning WYE included in this diagram was actually removed in the 1930s. Created to support the TRS19 version layout.