Talk:SAR Minvalara (Basic)
From TrainzOnline
(Difference between revisions)
m |
m |
||
Line 1: | Line 1: | ||
− | Track and switch diagram of Minvalara on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) early 1960s | + | Track and switch diagram of Minvalara on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. When the Broken Hill to Port Pirie line was later converted to standard gauge, the Quorn Line became an isolated narrow gauge branch line. Created to support the TRS19 version layout. |
Revision as of 12:40, 13 November 2019
Track and switch diagram of Minvalara on the South Australian Government Railways Northern Narrow Gauge System (Peterborough Division) shown as it existed in the early 1960s. When the Broken Hill to Port Pirie line was later converted to standard gauge, the Quorn Line became an isolated narrow gauge branch line. Created to support the TRS19 version layout.