How to Control Junctions in Sessions

From TrainzOnline
(Difference between revisions)
Jump to: navigation, search
m (Asking the User to Set Junctions)
m (Asking the User to Set Junctions)
Line 35: Line 35:
  
 
The following line is executed only if the junctions are set correctly
 
The following line is executed only if the junctions are set correctly
***'''Line 4: Message Popup''' Displays a message window sating that ht junctions are now correctly set.
+
***'''Line 4: Message Popup''' Displays a message window stating that the junctions are now correctly set.

Revision as of 14:27, 8 May 2018

The screenshots shown below give examples of how junction settings can be used to control the operation of a session.

Asking the User to Set Junctions

1. The Scenario:

A consist has been halted at a trigger placed in front of a junction. The user will be asked to set that junction and the following junction before the consist can proceed.

2. Rules Used:

3. Session Rules Screenshot:

TestJunctions.JPG

4. Example Explanation:

  • Line 1: Wait on Navigation Point The event is triggered when the consist halts at the navigation point assigned to the trigger. This executes the following rules simulaneously
    • Line 2: Message Popup Displays a message window asking that the next two junctions be manually set.
    • Line 3: Multiple Junction Alignment Check tests the switch directions of the next two junctions and waits until they are aligned as specified.
JunctionSettings.JPG
Checking junction switch settings

The following line is executed only if the junctions are set correctly

      • Line 4: Message Popup Displays a message window stating that the junctions are now correctly set.
Personal tools